Relationship Between Reliability and Cost of Performance Assessment
DOI:
https://doi.org/10.14507/epaa.v8n16.2000Palabras clave:
Costs, Elementary School Students, Elementary Secondary Education, High School Students, Higher Education, Performance Based Assessment, Reliability, Test Results, Undergraduate StudentsResumen
Performance assessments have come upon two major roadblocks: low reliability coefficients and high cost. Recent speculation has posited that the two are directly related such that cost must rise in order to increase reliability. This understanding may be an oversimplification of the relationship. Two empirical demonstrations are offered to show that more than one combination of sources of error may result in a desired generalizability coefficient and that it is possible to increase the number of observations while also decreasing cost.Descargas
Los datos de descargas todavía no están disponibles.
Descargas
Publicado
2000-03-08
Cómo citar
Parkes, J. (2000). Relationship Between Reliability and Cost of Performance Assessment. Archivos Analíticos De Políticas Educativas, 8, 16. https://doi.org/10.14507/epaa.v8n16.2000
Número
Sección
Articles